An assembly line is non-standard equipment, so before signing a contract two questions matter most: how quality is controlled, and what happens if something goes wrong. This page explains Tuoye's quality assurance and after-sales commitments - the exact terms always follow the contract.
Three-level inspection with full-line test runs
Incoming inspection: steel sections, rollers, slat chains and electrical components are checked batch by batch on arrival. In-process inspection: welding, assembly and wiring each have check points, with records kept for key dimensions. Final inspection: every complete line is pre-assembled, powered and test-run in our plant - conveying, stopping, lifting and other actions are verified one by one before shipment. Inspection records are archived with the equipment and open for your review at acceptance.
Warranty and after-sales
Complete lines carry a one-year warranty; non-artificial faults within the warranty period are handled according to the contract. After the warranty period we keep supplying spare parts long-term and provide paid repair service. Response is fast: if an issue cannot be solved by phone or remote support, we arrange on-site handling. A stopped line costs far more than the equipment itself - our after-sales principle is simple: get your line running again in the shortest possible time.
Verification of qualifications
Business licenses and other company qualifications are complete, and contracting and invoicing follow standard procedures - visitors can check the original documents at our factory. We do not make promises we cannot keep, and we do not exaggerate: the quality of an assembly line is proven by the pre-shipment test run and the on-site acceptance, not by advertising.









