Burn-in Section on an LED Lamp Assembly Line: Duration, Capacity and Yield Balance

1. Industry Overview
LED lighting runs many models in scattered batches, so lamp lines mix bulbs, tubes and panels on one line. An LED lamp assembly line — the trade also says LED lamp production line or LED lighting assembly line — carries the assembly from LED boards and drivers through shade, cap and whole-lamp light-on. LED placement finishes in SMT; the final-assembly side is manual stations on pallet conveying, with ESD protection and burn-in as the two design priorities. Whole-lamp safety and performance follow GB/T 24906 and GB/T 24908, and the light-on first test plus powered burn-in before ex-factory are mandatory steps.
2. Process Flow & Line Configuration
The typical LED lamp assembly flow: incoming board check (bright/dark dot sampling) → board to heatsink housing with locking (thermal grease) → driver wiring and fixing → shade and cap assembly → whole-lamp light-on first test → to the burn-in line for on/off aging → final check, labeling, packing. In a delivered project, the LED lamp production line runs dual parallel speedchains, aluminum frames with green ESD pallets circulating; station tables carry perforated fixture boards — a different lamp type passes the line with one board swap, changeover held at the ten-minute level; independent drawer tables on casters mean capacity grows by adding tables, not lines.
3. Configuration & Selection Tips
Stations on an LED lighting assembly line group by model family — bulb section, tube section, panel section each holding their stretch — cutting changeover frequency. Burn-in capacity sizes as daily program times each model's burn-in duration; the classic ailment is a full-built assembly section with too few burn-in slots, finished goods stacking at the tail in peak season — twenty percent margin on the calculated figure absorbs the rush. ESD covers pallets, strap monitoring and the grounding network, with ground resistance measured station by station before start-up and written into the periodic retest plan.
4. Delivery & Service
From lamp type list, daily program and workshop conditions, Tuoye — in Wenling, Taizhou, Zhejiang, China — issues the LED lamp assembly line proposal; equipment enters after in-plant pre-assembly and trial runs and commissions through trial production. One-year machine warranty, fixture boards, chains and station-table parts supplied long-term, plus speed-ups and burn-in expansions on existing LED lamp production lines.